Sammamish Kitchen Remodel

Structural Remodel with an Opened Floor Plan, Relocated Plumbing & a Rebuilt Island

The homeowners came to us wanting a kitchen that felt brighter and worked better for how they actually live. That’s a construction problem before it’s a design problem — you can’t get more light and a better flow by swapping door fronts. It takes a wall coming down, plumbing moving, and an island rebuilt in a new location. This project was that kind of remodel from the start.

A Structural Job, Not a Finish Refresh

“Kitchen remodel” covers a lot of ground, from a simple door-front swap to a full gut. This one was closer to the gut end. As the general contractor on the project, our scope covered:

  • Removing a partial wall to open the kitchen to the adjacent living space
  • Relocating the sink to a new location under the existing window — full drain rework, supply line rerouting, and venting
  • Repositioning and rebuilding the island to define the new boundary between the kitchen and the open space beyond it
  • Coordinating trades — plumbing, electrical, framing, and finish carpentry — on a schedule that kept the project moving without gaps between phases

Cabinetry, countertops, and flooring came from our partners at Cabinets Core, but the layout, the structural changes, and the sequencing that made those finishes possible were ours to plan and execute.

Get A Free Quote

Why the Sink Move Mattered

Relocating a sink is one of those decisions homeowners often get talked out of, because it adds real cost and real time to a project. We didn’t talk these homeowners out of it. The original sink location had no view and no natural light on it — and they cook every day. Daily-use plumbing decisions are the kind that are expensive to fix later and nearly impossible to defer once the kitchen is finished. Cosmetic upgrades can wait. Drain lines and venting can’t be an afterthought.

That’s the kind of call that has to get made early, before framing and rough-in — not mid-project once walls are already closed up.

Managing the Layout Change

Opening a kitchen isn’t just demo. Once that partial wall came down, we had to account for:

  • Structural support where the wall used to carry load
  • New sightlines between the kitchen and the adjacent space, which changed where the island could sit
  • Electrical and lighting circuits that needed to move with the new layout
  • Keeping the rest of the main floor functional while the kitchen was under construction

The island’s new position wasn’t a styling decision — it does the job the removed wall used to do, defining where the kitchen ends and the next space begins, just without closing off the room.

Get A Free Quote

Building for Storage That Actually Gets Used

The finishes get the attention, but a lot of what makes this kitchen work long-term is inside the cabinet boxes, and that’s coordinated during construction, not bolted on afterward:

  • Deep drawers under the cooktop instead of doors with fixed shelves, so pots and pans pull straight out
  • Pull-out pantry units in place of fixed shelving, for full visibility to the back
  • An integrated trash and recycling pull-out, built into the layout instead of added as an afterthought
  • A drawer-style cabinet near the relocated sink for towels and cleaning supplies

None of this happens without the rough-in, the cabinet layout, and the plumbing location all being planned together. Get the sequencing wrong and you end up retrofitting storage into a space that wasn’t built for it.

Scheduling a Job at This Scope

A structural kitchen remodel — wall removal, plumbing relocation, full electrical rework, and a complete finish package — sits at the higher end of kitchen project scope, and the schedule reflects that. On a project like this, homeowners are typically looking at roughly 14–18 weeks from design start to completion, depending on permitting, cabinet lead times, and how the trade schedule lines up.

That timeline is why sequencing matters as much as the individual trades. Framing and plumbing rough-in have to be locked before cabinets are ordered. Electrical has to be finalized before drywall closes the walls back up. A structural remodel is really a scheduling problem as much as a construction one, and managing that sequence is where a licensed general contractor earns their keep on a project like this.

The Case for Going Structural

The homeowners here didn’t just end up with a newer version of the same kitchen. They got a layout that actually connects to the rest of their home, plumbing that puts the sink where they use it, and storage that was planned into the build instead of added around it. That’s the difference between a finish-only renovation and a structural remodel — and it’s why the additional scope, cost, and time were worth it here.

If you’re weighing whether your Sammamish or greater Seattle kitchen needs a finish refresh or a structural rework, that’s the conversation we’re built for. Most homeowners either overshoot or undershoot the scope of what their kitchen actually needs. Getting that right — before demo starts, not after — is half the job of a general contractor.